top of page

Teradata Revamp:

A revamp project that converts the current existing data warehouse from ORACLE based to TERADATA base. Working to securely move from system to another system is really big challenge to take and need a lot of attention and smart work.

Latest Projects

VODAUS: 

Instead of staying blind about the postpaid customers activites till the end of their bill cycle, VODAUS projects simply simulates all what the billing engine will do online. It takes the advantage of being on top of an ODS platform and runs all the time and updates its' journals online.

PROJECTS

Most of my projects are on the telecommunication field and all of them are considered as a key and critical projects. I've successfully developed various types of projects.

 

Throughout my entire career, I am always curious about doing thing right and on the needed level of professionalism. Working on national and multinational companies on my career supported me a lot to accomplish this vision.

 

Below, you will find small description about some of the big projects that I am truly proud to be part of them. For more details about any project of them, kindly contact me directly.

Promotion Platform:

Online system that you can develop complex and near impossible promotion for you customers.

Built with an amazing architecture design that gives you the ability to offer any kind of promotions to you customers either simple or complex promo. Very generic and gives you unlimited possibilities to increase the company revenue.

Rate Plan Simulator:

Giving the customer the ability to customize his rate plan according to his need, is considered one of the most challenging parts in the telecom world. This project unlocks this challenge and allows the customer to choose his preferred rate plan and on the same time keeps the company profit and increases the customers loyalty and enhance their experience.

Supportive Presentations are also available below

Daily Activities

IBM DataStage upgrade:

Upgrading from IBM infosphere datastage V7.5 to V8.5 was a big project to work on as it has big challenging starting from migrating all the production jobs from version to new version without affecting the production environment. Also, make sure of smooth and tolerant free upgrade.

bottom of page